Blame
3cdf6f | spikej555 | 2025-03-21 23:24:24 | 1 | # Highway 25 |
2 | ||||
1ad00b | spikej555 | 2025-03-22 06:17:35 | 3 | Highway 25 is a multimodal, limited access highway connecting [[Brynhild|Regions/Brynhild]] and [[Arioyund|Regions/Arioyund]], and the only major roadway between the [[regions|Regions]]. It largely consists of bridges and tunnels, with very little of it at grade. Up to -10'000 Z (North), it is maintained by the [[Arioyund Department of Transportation|Agencies/Arioyund Department of Transportation]], and beyond that by the [[Brynhild Department of Transportation|Agencies/Brynhild Department of Public Works]]. It has a single lane protected Ice Express, and a two-block portion shared by a rail line and pedestrian traffic. Its single-elevation design allows all users to enjoy the beautiful views presented from its elevated segments, and makes boat travel simple. |
4 | ||||
5 |  |
|||
6 | _A bridge carrying Highway 25 over a jungle between Exit 52 in Brynhild and its interchange with Highway 54_ |
|||
7 | ||||
8 | ||||
9 | ### Route |
|||
10 | Highway 25's current Southern Terminus is with [[Highway 5|Transit/Routes/Highway 5]] in Arioyund. From there, it travels North. |
|||
11 | ||||
bf43bc | spikej555 | 2025-04-11 23:24:12 | 12 | >| # Exit 33 |
13 | >| Exit 33 provides local access VIA water elevator. At the base, there is a small farm. |
|||
14 | >|  |
|||
15 | >| _Exit 33, 2025 April 11th_ |
|||
16 | ||||
17 | >| # Exit 116 |
|||
18 | >| Exit 116 boasts ADoT's first Rest Area. There is a small, two-bed sleeping area as well as a garden. |
|||
19 | >| |
|||
20 | >|  |
|||
21 | >| _Exit 116 on 2025 April 11th_ |
|||
22 | ||||
23 | >| # Exit 145 |
|||
24 | >| Exit 145 provides access to the local river, as well as a pretty stunning cave system through a series of stairs and ladders. |
|||
25 | >| |
|||
26 | >|  |
|||
27 | >| |
|||
28 | >|  |
|||
29 | >| _Exit 145 on 2025 April 11th_ |
|||
30 | ||||
31 | At this point, Highway 25 enters a 258 meter tunnel. For the duration of this tunnel, the minecart track shifts to the edge to be against the tunnel wall. |
|||
32 | >| # Exit 175 |
|||
33 | >| Exit 175 provides local access by way of a short, 1 block wide staircase. Services include a rest area, garden, minecarts, and boats. |
|||
34 | >| Future plans exist to connect this exit to N 135th Street by way of a path to the [[Jessie O' Felzland Memorial Bridge|Transit/Bridges/Jessie O' Felzland Memorial Bridge]]. |
|||
35 | >| |
|||
36 | >|  |
|||
37 | >| _Exit 175 on 2025 April 11th_ |
|||
1ad00b | spikej555 | 2025-03-22 06:17:35 | 38 | |
4f724e | spikej555 | 2025-04-12 00:29:53 | 39 | >| # Exit 181 |
40 | >| Exit 181 provides beach access. There is no Ice Express exit here. |
|||
41 | >| |
|||
42 | >|  |
|||
43 | >| _Exit 181 on 2025 April 11th_ |
|||
44 | ||||
45 | >| # Exit 583 |
|||
46 | >| Exit 583 provides access to a nearby Woodland Mansion by way of a boat dock and a lit path, as well as access to a lookout. |
|||
47 | >| |
|||
48 | >|  |
|||
49 | >| _Exit 583, the boat dock, and path to the woodland mansion on 2025 April 11th_ |
|||
50 | >| |
|||
51 | >|  |
|||
52 | >| _The view from the lookout at sunrise. Taken 2025 April 11th_ |
|||
53 | ||||
efdc5e | spikej555 | 2025-04-17 02:11:26 | 54 | >| # Exit 822 |
55 | >| Exit 822 provides access to a staircase going up the mountainside |
|||
56 | >| |
|||
57 | >|  |
|||
58 | >| _Exit 822, 2025 April 11th_ |
|||
59 | ||||
60 | >| # Exit 837 |
|||
61 | >| Exit 837 provides access to a staircase to a mountain plain where several holes to the highway below are fenced off |
|||
62 | >| |
|||
63 | >|  |
|||
64 | >| _Exit 837, 2025 April 11th_ |
|||
65 | ||||
66 | >| # Exit 840 |
|||
67 | >| Exit 840 provides access to a staircase going up the mountainside, as well as beach access. There is also a small garden on the way to the beach. |
|||
68 | >| |
|||
69 | >|  |
|||
70 | >| _Exit 840, 2025 April 11th_ |
|||
71 | ||||
72 | >| # Exit 920 |
|||
73 | >| Exit 920 provides access to a staircase going up the mountainside |
|||
74 | >| |
|||
75 | >|  |
|||
76 | >| _Exit 920, 2025 April 11th_ |
|||
77 | ||||
78 | >| # Arioyund/Brynhild Border |
|||
79 | >| The [[Arioyund|Regions/Arioyund]]/[[Brynhild|Regions/Brynhild]] |
|||
80 | >| |
|||
81 | >|  |
|||
82 | >|  |
|||
83 | >| _2025 April 11th_ |
|||
84 | ||||
85 | >| # Exit 277 |
|||
86 | >| Exit 277 provides access to the Valley Village Reservation. Services include the village farms and buildings, which are available for use by visitors passing through. |
|||
87 | >| |
|||
88 | >|  |
|||
89 | >| _Exit 277, 2025 April 11th_ |
|||
90 | ||||
91 | >| # Exit 307 |
|||
92 | >| Exit 307 provides access to a nearby pillager outpost. |
|||
93 | >| |
|||
94 | >|  |
|||
95 | >| _Exit 307, 2025 April 11th_ |
|||
96 | ||||
97 | >| # Exit 345 |
|||
98 | >| Exit 345 provides access to a nearby village. |
|||
99 | >| |
|||
100 | >|  |
|||
101 | >| _Exit 345, 2025 April 11th_ |
|||
4f724e | spikej555 | 2025-04-12 00:29:53 | 102 | |
efdc5e | spikej555 | 2025-04-17 02:11:26 | 103 | >| # Highway 325 |
104 | >| Highway 325 is a spur of Highway 25 that branches off at Z = -13662. Plans are for it to travel east to a stronghold. |
|||
105 | >| |
|||
106 | >|  |
|||
107 | >| _Junction of Highway 325 and Highway 25 on 2025 April 15th_ |
|||
108 | ||||
109 | >| # Exit 520 |
|||
110 | >| Exit 520 provides local access. There are no services. |
|||
111 | >| |
|||
112 | >|  |
|||
113 | ||||
114 | >| # Ayrith Interchange (Junction 25/54) |
|||
115 | >| The Ayrith Interchange is a tower where Highway 25 and [[Highway 54|Transit/Routes/Highway 54]] meet. Rail/Pedestrians and the Ice Express are grade-separated at the interchange, and all rail lines have terminuses at the interchange, requiring manual switching of lines. |
|||
116 | >| |
|||
117 | >|  |
|||
118 | >|  |
|||
119 | >| _Pictures of the Ayrith Interchange, taken 2025 April 16th_ |
|||
1ad00b | spikej555 | 2025-03-22 06:17:35 | 120 | |
121 | ||||
efdc5e | spikej555 | 2025-04-17 02:11:26 | 122 | There are plans to expand it north indefinitely, but currently it dead ends not far north of Highway 54. Future plans include grade-separated rail, pedestrian, and ice express paths, as well as multi-track rail to support the planned industrial area in the savannah further north. |