2025-04-11 23:24:12spikej555:
Added Exits up to 175
transit/routes/highway 25.md ..
@@ 9,7 9,32 @@
### Route
Highway 25's current Southern Terminus is with [[Highway 5|Transit/Routes/Highway 5]] in Arioyund. From there, it travels North.
-
This segment is missing details. You can help by editing it!
+
>| # Exit 33
+
>| Exit 33 provides local access VIA water elevator. At the base, there is a small farm.
+
>| 
+
>| _Exit 33, 2025 April 11th_
+
+
>| # Exit 116
+
>| Exit 116 boasts ADoT's first Rest Area. There is a small, two-bed sleeping area as well as a garden.
+
>|
+
>| 
+
>| _Exit 116 on 2025 April 11th_
+
+
>| # Exit 145
+
>| Exit 145 provides access to the local river, as well as a pretty stunning cave system through a series of stairs and ladders.
+
>|
+
>| 
+
>|
+
>| 
+
>| _Exit 145 on 2025 April 11th_
+
+
At this point, Highway 25 enters a 258 meter tunnel. For the duration of this tunnel, the minecart track shifts to the edge to be against the tunnel wall.
+
>| # Exit 175
+
>| Exit 175 provides local access by way of a short, 1 block wide staircase. Services include a rest area, garden, minecarts, and boats.
+
>| Future plans exist to connect this exit to N 135th Street by way of a path to the [[Jessie O' Felzland Memorial Bridge|Transit/Bridges/Jessie O' Felzland Memorial Bridge]].
+
>|
+
>| 
+
>| _Exit 175 on 2025 April 11th_
Eventually, it reaches Exit 52 in Brynhild, with local access before intersecting [[Highway 54|Transit/Routes/Highway 54]].