Commit bf43bc

2025-04-11 23:24:12 spikej555: Added Exits up to 175
transit/routes/highway 25.md ..
@@ 9,7 9,32 @@
### Route
Highway 25's current Southern Terminus is with [[Highway 5|Transit/Routes/Highway 5]] in Arioyund. From there, it travels North.
- This segment is missing details. You can help by editing it!
+ >| # Exit 33
+ >| Exit 33 provides local access VIA water elevator. At the base, there is a small farm.
+ >| ![](./image-1744411833288.49.52.png)
+ >| _Exit 33, 2025 April 11th_
+
+ >| # Exit 116
+ >| Exit 116 boasts ADoT's first Rest Area. There is a small, two-bed sleeping area as well as a garden.
+ >|
+ >| ![](./image-1744412311576.57.32.png)
+ >| _Exit 116 on 2025 April 11th_
+
+ >| # Exit 145
+ >| Exit 145 provides access to the local river, as well as a pretty stunning cave system through a series of stairs and ladders.
+ >|
+ >| ![](./image-1744412781554.04.27.png)
+ >|
+ >| ![](./image-1744412841713.07.07.png)
+ >| _Exit 145 on 2025 April 11th_
+
+ At this point, Highway 25 enters a 258 meter tunnel. For the duration of this tunnel, the minecart track shifts to the edge to be against the tunnel wall.
+ >| # Exit 175
+ >| Exit 175 provides local access by way of a short, 1 block wide staircase. Services include a rest area, garden, minecarts, and boats.
+ >| Future plans exist to connect this exit to N 135th Street by way of a path to the [[Jessie O' Felzland Memorial Bridge|Transit/Bridges/Jessie O' Felzland Memorial Bridge]].
+ >|
+ >| ![](./image-1744413522242.16.54.png)
+ >| _Exit 175 on 2025 April 11th_
Eventually, it reaches Exit 52 in Brynhild, with local access before intersecting [[Highway 54|Transit/Routes/Highway 54]].
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9