# Highway 25

Highway 25 is a multimodal, limited access highway connecting [[Brynhild|Regions/Brynhild]] and [[Arioyund|Regions/Arioyund]], and the only major roadway between the [[regions|Regions]]. It largely consists of bridges and tunnels, with very little of it at grade. Up to -10'000 Z (North), it is maintained by the [[Arioyund Department of Transportation|Agencies/Arioyund Department of Transportation]], and beyond that by the [[Brynhild Department of Transportation|Agencies/Brynhild Department of Public Works]]. It has a single lane protected Ice Express, and a two-block portion shared by a rail line and pedestrian traffic. Its single-elevation design allows all users to enjoy the beautiful views presented from its elevated segments, and makes boat travel simple.

![](./image-1742623920878.png)
_A bridge carrying Highway 25 over a jungle between Exit 52 in Brynhild and its interchange with Highway 54_
 

### Route
Highway 25's current Southern Terminus is with [[Highway 5|Transit/Routes/Highway 5]] in Arioyund. From there, it travels North.

>| # Exit 33
>| Exit 33 provides local access VIA water elevator. At the base, there is a small farm.
>| ![](./image-1744411833288.49.52.png)
>| _Exit 33, 2025 April 11th_

>| # Exit 116
>| Exit 116 boasts ADoT's first Rest Area. There is a small, two-bed sleeping area as well as a garden.
>| 
>| ![](./image-1744412311576.57.32.png)
>| _Exit 116 on 2025 April 11th_

>| # Exit 145
>| Exit 145 provides access to the local river, as well as a pretty stunning cave system through a series of stairs and ladders.
>| 
>| ![](./image-1744412781554.04.27.png)
>| 
>| ![](./image-1744412841713.07.07.png)
>| _Exit 145 on 2025 April 11th_

At this point, Highway 25 enters a 258 meter tunnel. For the duration of this tunnel, the minecart track shifts to the edge to be against the tunnel wall.
>| # Exit 175
>| Exit 175 provides local access by way of a short, 1 block wide staircase. Services include a rest area, garden, minecarts, and boats.
>| Future plans exist to connect this exit to N 135th Street by way of a path to the [[Jessie O' Felzland Memorial Bridge|Transit/Bridges/Jessie O' Felzland Memorial Bridge]].
>| 
>| ![](./image-1744413522242.16.54.png)
>| _Exit 175 on 2025 April 11th_

>| # Exit 181
>| Exit 181 provides beach access. There is no Ice Express exit here.
>| 
>| ![](./image-1744416320127.33.47.png)
>| _Exit 181 on 2025 April 11th_

>| # Exit 583
>| Exit 583 provides access to a nearby Woodland Mansion by way of a boat dock and a lit path, as well as access to a lookout.
>|  
>| ![](./image-1744417329017.20.55.png)
>| _Exit 583, the boat dock, and path to the woodland mansion on 2025 April 11th_
>|  
>| ![](./image-1744417532899.25.09.png)
>| _The view from the lookout at sunrise. Taken 2025 April 11th_

>| # Exit 822
>| Exit 822 provides access to a staircase going up the mountainside
>| 
>| ![](./image-1744428442515.25.04.png)
>| _Exit 822, 2025 April 11th_

>| # Exit 837
>| Exit 837 provides access to a staircase to a mountain plain where several holes to the highway below are fenced off
>| 
>| ![](./image-1744428733282.31.05.png)
>| _Exit 837, 2025 April 11th_

>| # Exit 840
>| Exit 840 provides access to a staircase going up the mountainside, as well as beach access. There is also a small garden on the way to the beach.
>| 
>| ![](./image-1744428894697.33.51.png)
>| _Exit 840, 2025 April 11th_

>| # Exit 920
>| Exit 920 provides access to a staircase going up the mountainside
>| 
>| ![](./image-1744429016401.36.16.png)
>| _Exit 920, 2025 April 11th_

>| # Arioyund/Brynhild Border
>| The [[Arioyund|Regions/Arioyund]]/[[Brynhild|Regions/Brynhild]]
>| 
>| ![](./image-1744429132922.38.05.png)
>| ![](./image-1744429197532.38.17.png)
>| _2025 April 11th_

>| # Exit 277
>| Exit 277 provides access to the Valley Village Reservation. Services include the village farms and buildings, which are available for use by visitors passing through.
>| 
>| ![](./image-1744429745426.46.59.png)
>| _Exit 277, 2025 April 11th_

>| # Exit 307
>| Exit 307 provides access to a nearby pillager outpost.
>| 
>| ![](./image-1744429858316.49.50.png)
>| _Exit 307, 2025 April 11th_

>| # Exit 345
>| Exit 345 provides access to a nearby village.
>| 
>| ![](./image-1744429995990.52.41.png)
>| _Exit 345, 2025 April 11th_

>| # Highway 325
>| Highway 325 is a spur of Highway 25 that branches off at Z = -13662. Plans are for it to travel east to a stronghold.
>| 
>| ![](./image-1744821734946.png)
>| _Junction of Highway 325 and Highway 25 on 2025 April 15th_

>| # Exit 520
>| Exit 520 provides local access. There are no services.
>| 
>| ![](./image-1742624039402.png)

>| # Ayrith Interchange (Junction 25/54)
>| The Ayrith Interchange is a tower where Highway 25 and [[Highway 54|Transit/Routes/Highway 54]] meet. Rail/Pedestrians and the Ice Express are grade-separated at the interchange, and all rail lines have terminuses at the interchange, requiring manual switching of lines.
>| 
>| ![](./image-1744855621585.png)
>| ![](./image-1744855671498.png)
>| _Pictures of the Ayrith Interchange, taken 2025 April 16th_


There are plans to expand it north indefinitely, but currently it dead ends not far north of Highway 54. Future plans include grade-separated rail, pedestrian, and ice express paths, as well as multi-track rail to support the planned industrial area in the savannah further north.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9