# Jessie O' Felzland Memorial Bridge

The Jessie O' Felzland Memorial Bridge was constructed as part of the [[N 135th Street|Transit/Routes/N 135th Street]] expansion project and completed on 2025 February 9th. Plans exist to build a road from its Western Terminus to [[Highway 25|Transit/Routes/Highway 25]] at Exit 175.

>| # Gallery
>| All pictures taken 2025 April 11th
>| 
>| ![](./2025-04-11_17.29.24.png)
>| Bridge from the Eastern Terminus
>| 
>| ![](/Transit/Bridges/Jessie%20O'%20Felzland%20Memorial%20Bridge/2025-04-11_17.29.40.png)
>| Bridge looking down from above N 135th Street
>| 
>| ![](./2025-04-11_17.30.05.png)
>| Bridge from the Western Terminus
>| 
>| ![](/Transit/Bridges/Jessie%20O'%20Felzland%20Memorial%20Bridge/2025-04-11_17.30.20.png)
>| Bridge looking over from the Western Approach
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9